HONGYANG GROUP Nauru Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Nauru Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

U207 Transformer

fuel-dispenser

U207 Transformer

Features:

Quality silicon steel

Excellent nonconductive voltage

The presetting wattage excess

Weight:1.7Kg

100% Factory Tested.

products links

links

technical archives

    on and noise of pump, finding whether leakage between axis end and pump cover, checking the excessive jump and swing of V wheel that is called belt wheel past, but now defined as V wheel in GBT/10412�002 General V Wheel. Don’t use water and oil with water to debug or cleanse tank in case of the pump and components of fuel dispenser is rust. Meanwhile preventing freeze water affect the normal operation because of low temperature. Regularly inspect and cleanse strainer, especial after installation a pipeline. With the working time get long the waste in pipeline or tank decrease, the period of checking and cleanse should considerably lengthen. But don’t exceed one month. The strength of V wheel should be appropriate because low strength result in no oil discharge out or inefficiency. High strength, in another case, would increase the axis loan of motor and pump, fasting bearing abrasion of motor, pump and oil seal. Don’t adjust overflow valve to tight in case of increasing pump pressure so as to flux passing overflow valve, and well as noise, vibration and abrasion. Judgment for common failures Firstly, some failure analysis and correct judgment is necessary before maintenance. The principle of first analysis then fuel dispenser disassemble, easy first is the fuel dispenser basis to judge trouble. The common failure phenomenon of vane pump is that no delivery, inefficient flux, leakage, noise and abnormal vibration. They will be introduced one by one. No delivery or inefficient flux Apart from pump failure other component and pipeline trouble may also result in this phenomenon. Here only introduce pump failure and inspection method. Exterior inspection: to check motor that maybe don’t work, or rotate in opposite direction, or lose V wheel. Reversal result from wrongly connecting two phase wire in motor or power supply. Adjusting strength of V wheel or changing a new one deal with wheel slip. However, the reason that motor don’t work are several, either electric or mechanical failure. Disconnecting V wheel at first, fuel dispenser

technical specification

    erforms any checkfunctionality according to cardconfigurationsystem   status  8. If EPS gets into an exception status transaction not possible to complete EPS tells POS   that pre-authorisation was not ok. This process aborts POS is still at the initial status and   cashier selects another method of payment.  9. If POS fails to receive a response from EPS (EPS failure) this process aborts POS is still   at the initial status and cashier selects another method of payment. In the meantime the   problem on EPS might be fixed (but it is not possible to manage the pre-authorisation reversal   unless managed by the EPS application autonomously).  August 2002 IFSF STANDARD FORECOURT PROTOCOL FP319_1.00   EPS POS INTERFACE SPECIFICATION   Page 24 of 146  10. If EPS tells POS the pre-authorisation response but POS has failed (e.g. fails to get the   acknowledge): this process aborts (but it is not possible to manage the pre-authorisation   reversal unless managed by the EPS application autonomously). The cashier has to manage   the POS recovery.  11. If not successful EP fuel dispenser S tells POS that the pre-author fuel dispenser isation was ko. This process aborts   POS is still at the initial status and cashier selects another method of payment.  12. If successful EPS tells POS that a pre-authorisation was ok providing restrictions data   (amountproductvolume) and the process continues.  13. Customer selects valid pumpnozzle  14. Customer refills up to the limit of pre-authorisation  15. If customer fails to refill the pre-authorisation is reversed or the financial advice is set to zero   value.  16. If POS fails the cashier has to recover it and if the transaction is lost a manual procedure   must help to complete the payment and the sales receipt.  17. POS passes sales information to EPS requesting fuel dispenser

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    police raids, arrests and the investigation into allegations that at least �00m ($265m) was siphoned out of secret bank accounts in Liechtenstein, Austria and Switzerland. A page-turning airport thriller? No, the 20-F filing submitted by Siemens, a German conglomerate, to the Securities and Exchange Commission in Washington, DC on December 11th. At the same time, the firm restated its earnings to take account of uncertainties over transactions being investigated by state prosecutors in at least three countries. The purpose of these murky dealings remains unclear was it a case of self-enrichment by crooked employees or something more sinister—carefully laundered bribes to win Siemens business in some of the 190 countries in which it operates? Siemens insists that it was a victim of crime not an accessory to it. It is investigating �20m of suspicious payments to consultants over the past seven years. Meanwhile, six present and former employees, including one former board member arrested on December 12th, are in custody. In the flow of adverse publicity since police raided 30 of its offices a month ago, Siemens has tried to show that it is taking appropriate action. It announced the formation of a “task forc fuel dispenser e�to clarify and standardise i fuel dispenser ts employees business practices. It also appointed an ombudsman to encourage internal whistleblowing. But for Transparency International (TI), an anti-corruption campaign group, this was not enough. It had already suspended Siemens s membership of its German chapter in 2004 because of the company s reluctance to be transparent about an unresolved bribery case in Italy. (The case was settled last month without admission of guilt.) Siemens s sluggish reaction to investigations in Liechtenstein triggered a letter last month from TI warning that the firm s membership would be liable for termination after December 15th. At an emergency board meeting this week Siemens announced new measures to show how determined it is to change its culture. It appoi fuel dispenser