HONGYANG GROUP Nauru Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Nauru Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

P-G22 FUEL DISPENSER

P-G22

P-G22 FUEL DISPENSER

Pump Type :Optional

Inlet Pressure : >=54kPa.

Flow rate (L/min.) :55±5

Suction Distance (m): 6(verticalmente) / 50(orizzontalmente)

FlowMeter Type : Optional

Accuracy :±0.2%

Motor Voltage(V): 110V/220V/380V,50Hz/60Hz

Capacity(hp): 1HP(0.75kw)

Input Voltage : 110V/220V/380V,50Hz/60Hz

Nozzle : Auto Shut-off Nozzle

Environmental Condition :-40~~+55degree

Control Type :Solenold Vale Control Type

Preset: Function Provided(Small LCDIndicator)

Display(Counter) :Type LCD and Bright Backlight

Digit of Volume : 0~~999,999(6 Digits),Decimal point can be changed

Digit of Amount :0~~999,999(6 Digits),Decimal point can be changed

Digit of Unit price : 0~~9999(4 Digits),Decimal point can be changed

Digit of Total Range : 0~~99,999,999,99

Optional Display :Type LCD and Bright Backlight

Digit of Volume :0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Amount :0~~99,999,999(8 Digits),Decimal point can be changed

Digit of Unit price : 0~~999999(6 Digits),Decimal point can be changed

Digit of Total Range :0~~99,999,999,99

Totalizer: 1~~9,999,999

Hose: 4.5m

Weight : 235kg

Dimension(L×W×H): 1060*550*1620(mm)

Dimension(L×W×H)Of Qty of Container : 40ft: 44 20ft: 22

products links

links

technical archives

    keep good earthing and sealability and conduct pressure –resistance test as regulation in national standard GB50156-2002. Don’t input oil or burry tank before pressure testing. Diagram 5-4: Correc fuel dispenser t installation of fuel dispenser and tank The inlet pipe of tank should be mounted bottom valve, which is vertical and 100mm higher than tank bottom. As crucial to fuel dispenser’s normal operation, bottom valve should have good sealability and performance. It is prohibited to connect fuel dispenser with semi-underground tank, above ground tank and high position tank. If oil level is higher than vapor separator exhaust pipe would overflow leading to insecurity working circumstance. Given have to adapt one of above tank, the exhaust pipe of vapor separator should be sealed in case oil overflow out. Match of fuel dispensers and tank: if adopt one tank delivering oil to two or more fuel dispensers each fuel dispenser should have single pipe without interconnection. Diagram 7-4 shows the right connection. Diagram 5-5 is wrong one. Diagram 5-5: Inappropriate installation of fuel dispenser and tank If one fuel dispenser is connected to two or more tanks valve is necessary to be installed in pipeline. Diagram 5-6 illustrates this kind of connection. In short, the connection of fuel dispensers and tanks, whatever working circumstance, should comply with the basic principle that one tank, one valve and one pipe are connected with one fuel dispenser. Otherwise, the normal measuring function of fuel dispenser would be affected. Diagram 5-6: Combination o fuel dispenser f two or more tanks Electric Installation The general power switch is installed indoors, switch fuse is defined as the current of motor when starting. The earthing line of fuel dispenser should firstly connect with ground device of filling station before el fuel dispenser ectric installation. Power wire of fuel dispenser should connect into TN-S power supply system, compatible to TN-C-S and TN-C systems. Lead and wire should be five-bind copper thread with two protective

technical specification

    em.  EPS The application that manages the card payment application.  Main Flow Description  1. CashierOperator or POS application triggers the logoff.  2. If POS fails th fuel dispenser e process is aborted and the cashier has to recover the POS.  3. POS requests to EPS the logoff.  4. If message invalid it is repeated or the process is aborted and the cashier receives a specific   alarm. POS is still at the initial status.  5. EPS accepts the logoff  6. If EPS gets into an exception status transaction not possible to complete the transaction   gives a negative response.  7. If POS fails to receive a response from EPS (EPS failure) it considers the logoff failed.  8. If EPS tells POS the response but POS has failed (e.g. fails to get the acknowledge) it   considers the logoff failed.  9. If completed EPS tells POS the result (positive or negative).  10. If successful both applications are not operative toeachotherand available for maintenance etc.  11. If the result is negative it might be necessary to operate anyway even if more attepts fail: in the   end the failure is ignored.  3.17 Part A - use case: Send Offline Transactions  In case the EPS application would support off-line transaction authorisation these transactions must be  forwarded to a host. Regardless how this is accomplished by the EPS application (e.g. ftp) this delivery  might be triggered by the cashier or the POS application for some reasons.  Pre-Conditions  The cashierSiteManager wants to trigger the off-lin fuel dispenser e transaction log transmission or the POS Sell  applications triggers it upon a time set or match of predefined conditions.  The POS application is logged on with the EPS application.  There is no pending message between the two applications from that w fuel dispenser orkstation.  Actors  Actor Description  Cashier Person who might trigger the operation on the POS Sell applicat

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    ponder the package of incentives the six countries put to it last week. The hope is that any hard bargaining will be under way before the G8 summit (involving the G7 rich countries plus Russia) in St fuel dispenser Petersburg in mid-July. This week, the 35-nation board of the International Atomic Energy Agency (IAEA), the United Nations nuclear guardian, had before it yet another report listing inspectors concerns about Iran s nuclear activities. But the real action was elsewhere. Iran s outspoken president, Mahmoud Ahmadinejad, was in China, quietly sitting in on a meeting of the Shanghai Co-operation Organisation, which includes four Central Asian states and Russia too. The behind-the-scenes messages he and other officials are getting from Russia and China over Iran s nuclear ambitions may determine whether the nuclear diplomacy can succeed. Both countries have been reluctant to press the other element of the agreed package economic, financial and political sanctions. But without real costs to weigh against its nuclear plans, Iran will have little reason to consider the suspension of uranium enrichment and plutonium dabbling (both are usable for nuclear fuel-making but abusable for bomb-making) that the Europeans and others have made a condition for negotiations. Plenty of countries, including Russia and China, but also Japan, India and Malaysia, that trade heavily with Iran are still chary of sanctions, unless ordered by the UN Security Council (where Russia and China, Iran notes, have vetoes). America, meanwhile, has been leaning on forei fuel dispenser gn banks to curb their dealings with Iran. This week, it added five companies (four in China, and another in the United States but representing a Chinese outfit) to its list of those fingered for assisting Iran s weapons programmes and so banned from doing fuel dispenser business with American companies. When Iran does reply, it is unlikely to give a straight yes or no. It has hinted at counter-proposals to include continued enrichment work, while perhaps accepting tempora